Summer Harvard construction: Fogg Art Museum, Tata Hall, Quincy House

Summer construction—on the Fogg Art Museum, the Business School’s Tata Hall, Old Quincy, and more—renews the campus.

This view of the Fogg Art Museum, taken in mid summer, shows the new structure being inserted in the original Quincy Street façade.
Fogg (from Carpenter Center ramp)
Fogg (entrance side)
Fogg (entrance side)
Quincy House
Quincy House
Science Center          
Anderson Memorial Bridge
Anderson Memorial Bridge
Anderson Memorial Bridge
Anderson Memorial Bridge
Tata Hall

[extra:Extra]

Scroll above to see additional construction images beyond what appeared in print. 

That sound heard on campus this summer, after the post-Great Recession stillness, was of earth moving again—and steel being lifted and concrete poured, making Harvard modern.

The reconstruction of the Fogg Art Museum proceeded most visibly (progressing toward a 2014 reopening). The aerial view, in mid summer, shows the new structure being inserted into the Quincy Street façade; the frame has since been fitted with the angled supports for a sharply canted, glassed-in, rooftop crown in architect Renzo Piano’s signature style. Scaffolding is now in place to enable exterior construction around the new structure. (Images above detail the work as seen from the Carpenter Center and Quincy Street, respectively.)

Renovation of Old Quincy appears much simpler, but it is the test for design and construction concepts underlying renovation of the undergraduate Houses, a multiyear, $1-billion-plus program (see "Designating Dunster"). Across the river, the curving lines of Tata Hall, Harvard Business School’s new executive-education complex, took shape. (See "Architecture in Concert" for a profile of architect William Rawn.)

Public infrastructure investments advance University links to the community, too. Contractors stripped the Science Center plaza to repair the waterproofing of the Cambridge Street tunnel beneath; when the job is done, Harvard will redesign the plaza to encourage social interactions and host performances, in time for Commencement 2013. And the Commonwealth’s aggressive repair program has reached the Anderson Memorial Bridge. Traffic lanes and sidewalks are constricted—tailgaters be warned!

You might also like

The True Cost of Grade Inflation at Harvard

How an abundance of A’s created “the most stressed-out world of all.”

Harvard Magazine Questionnaire: The True Cost of Grade Inflation

A faculty committee is recommending changes to grading at Harvard College to limit an overabundance of A's. Add your voice to the conversation.

Harvard Faculty Group Proposes Limits on A Grades

The grade inflation measure requires a full faculty vote, expected in the spring.

Most popular

Harvard’s Epstein Probe Widened

The University investigates ties to donors, following revelations in newly released files.

Martin Nowak Sanctioned for Jeffrey Epstein Involvement

The Faculty of Arts and Sciences announces disciplinary actions.

U.S. Military to Sever Some Academic Ties with Harvard, Hegseth Says

The defense department will discontinue graduate-level professional programs for active-duty service members.

Explore More From Current Issue

A jubilant graduate shouts into a megaphone, surrounded by a cheering crowd.

For Campus Speech, Civility is a Cultural Practice

A former Harvard College dean reviews Princeton President Christopher Eisgruber’s book Terms of Respect.

A stylized illustration of red coral branching from a gray base, resembling a fantastical entity.

This TikTok Artist Combines Monsters and Mental Heath

Ava Jinying Salzman’s artwork helps people process difficult feelings.

Two bare-knuckle boxers fight in a ring, surrounded by onlookers in 19th-century attire.

England’s First Sports Megastar

A collection of illustrations capture a boxer’s triumphant moment.